Month: May 2014

Completion nears on Handy & Handy Orthondic Clinic

IMG_7396Wilson-Covington is nearing completion on the Drs. Handy & Handy Orthodontists Office in Bermuda Run, NC.

The office is 7,500 square feet on two floors and features 7 patient chairs, consultation room, laboratory, imaging room, offices, staff lounge, storage, and restrooms. Wilson-Covington has worked extensively in the medical and dental fields and this project marks the most recent in a long collaboration between Wilson-Covington and Drs. Handy & Handy.

Salt-Flax Restoration Update


Wilson-Covington continues restoration of the 1814 Salt-Flax shop and home in Old Salem, Winston-Salem, NC. Currently work is under way to shore the framing of the home and dig out the front three foundation walls. This will allow for installation of modern CMU walls that can be waterproofed, allowing for living space under the front shop of the structure. The existing stone and brick foundations were structurally failing. Original material will be used where visible to show visitors and guests the construction of the home while allowing for 21st century amenities in the basement.

Other work in progress includes framing repair and replacement on the main level of the home and roof replacement. The roof will be re-roofed with pressure treated pine shakes to mimic the original wood shakes.

Wilson-Covington- Specializing in the Difficult

HT wall

HT wall 2

Wilson-Covington is proud to be complete removing a solid CMU and concrete wall in an operational grocery store. This work was done at night and the dust and debris kept out of the retail area. Wilson-Covington specializes in this type of difficult and dirty work while keeping the customer’s store or home clean and neat.